Home

Installing Cogeneration

Cogeneration works at a higher efficiency than other green energy technology options and is easier to implement on a large scale to contribute to an establishment’s energy needs. Cogeneration is cleaner than centralized power generation and yields more outcomes.

Another advantage that Cogeneration has over centralized generation is the ease of installation. Because a CHP Cogeneration system can be installed at any time during the life of a building this technology can improve the value of a building at any time. Cogeneration can be introduced to a building at any of the following times:

         When designing a new building;

         Replacing or installing a new boiler plant;

         Re-developing out-dated buildings;

         Increasing the reliability of power being supplied to the building;

         Improving the financial performance of the building;

         Increasing the efficiency of the building.

The size and functionality of Cogeneration systems allow it to be retrofitted or added into the design stage of planning for new development.